EPA Grants Louisiana Class VI Primacy Over Carbon Storage Wells
Louisiana Senator Bill Cassidy’s announcement on December 29th, regarding the Environmental Protection Agency (EPA) granting Class VI primacy to the state for regulating carbon storage wells, marks a significant milestone in Louisiana’s carbon capture efforts. For further details on this development, you can find more information here.
National Academy of Sciences Valve Report
As part of the Protecting Our Infrastructure of Pipelines and Enhancing Safety (PIPES) Act of 2020, PHMSA was directed under Section 119 to have the National Academies of Sciences, Engineering, and Medicine (The National Academies) to conduct a study of potential methodologies or standards for the installation of automatic or remote-controlled shut-off valves on existing pipelines. The NAS has completed an encompassing report that you can read or download from their website.
2024 D&A Random Rate, MIS Reporting Data
Docket No. PHMSA-2023-0116
On December 8th, 2023, PHMSA published in the Federal Register a notice announcing that it has determined the minimum random drug testing rate for covered employees will remain at 25 percent during calendar year 2024. Of special note, for calendar year 2023 reporting, DOT is introducing MFA login procedures for submitting D&A testing data into the DAMIS database. This notice also explains how pipeline operators and contractors will obtain MFA login information. The effective dates of the current January 1, 2024, through December 31, 2024.
For a copy of the published notice, please message Jessica Foley.
GPAC Meeting Notice March 2024
The next Gas Pipeline Advisory Committee (GPAC) meeting will discuss the Leak Detection and Repair (LDAR) and Class Location Notice of Proposed Rule Makings (NPRM). The meeting is set to take place March 25-29, 2024. The plan is to start each day at 8:30 AM and continue through Friday until both rules are completed. However, the meeting may end early if the GPAC completes its review of the proposed rules. Members of the public who wish to attend are requested to register no later than March 18, 2024.
For more information regarding the meeting location, agenda, and any additional information, including on how to participate in the meeting, click here.
For a copy of the meeting notice, please message Jessica Foley.
Did you know?
Smart energy policies should include ways to reduce energy consumption by utilizing current energy infrastructure efficiently and planning for our energy future in a way that protects consumer choice. This strategy would balance energy needs and ultimately ensure energy infrastructure is secure and economically viable for future generations. Learn more by clicking here.

Q&A Section
Do you have a question for the experts at RCP? Submit your question using this form. If your question is selected for a future newsletter, you will be eligible for a gift of your choice from RCP’s online Store.
Upcoming Deadlines:
- The deadline to submit written comments in response to PHMSA’s forthcoming NPRM on Pipeline Safety: Safety of Gas Distribution Pipeline and Other Pipeline Safety Initiatives will have 60 days from the date of publication in the Federal Register. Comments may be filed at https://www.regulations.gov/ Docket No. PHMSA-2021-0046.
- And as a reminder, the “Stay of Enforcement” does not mean regulators don’t expect work toward getting compliance activities in place can be ignored.
If we can help, contact Jessica Foley.
Do you have questions? RCP’s SMEs have the answers. Information will be posted here for questions we often get from clients or discussions we have with regulators regarding interpretations and pending regulatory deadlines.
Q: If a liquid pipeline operator installs the wrong style of gasket in a flange during a maintenance repair, and then the joint leaks 1 barrel of oil during startup, is that considered a maintenance-related release? Does the spill need to be reported?
A: Liquid pipelines report spills larger than 5 gallons, unless the release is “resulting from a pipeline maintenance activity”, in which case the volume threshold is 5 barrels. To qualify for the higher maintenance-related reporting threshold, the spill must occur as part of the maintenance activity. Installing the wrong style of gasket is due to operator error and falls under the 5 gallon, not the 5 barrel, reporting threshold.
Ask the Experts
Do you have a question for the experts at RCP? Submit your question using this form. If your question is selected for a future newsletter, you will be eligible for a gift of your choice from RCP’s online Store.
Upcoming Deadlines:
- The deadline to submit written comments in response to PHMSA’s forthcoming NPRM on Pipeline Safety: Safety of Gas Distribution Pipeline and Other Pipeline Safety Initiatives will have 60 days from the date of publication in the Federal Register. Comments may be filed at https://www.regulations.gov/ Docket No. PHMSA-2021-0046.
- And as a reminder, the “Stay of Enforcement” does not mean regulators don’t expect work toward getting compliance activities in place can be ignored.
If we can help, contact Jessica Foley.
These articles are maintained and updated as new information becomes available.
Regulatory Watch: Key Dates & Deadlines
Track PHMSA rulemaking, regulatory stages, and important compliance deadlines in RCP's Regulatory Watch.
View Full Regulatory Watch →Conference News
Pipeline Pigging and Integrity Management Conference
The 39th International Pipeline Pigging & Integrity Management Conference (PPIM) will take place at the George R. Brown Convention Center in Houston. The event brings together pipeline operators, engineers, and industry professionals to explore advancements in pipeline inspection, integrity management, risk assessment, and emerging technologies.…
RCP Team Attending
Heather Roark
Jessica FoleyPSI Training Schedule

| Date | Training Course | Price | Registration |
|---|---|---|---|
| Nov 17 – Nov 19, 2026 | DOT Pipeline Compliance Workshop | $2,150 | SOLD OUT |
| Feb 16 – Feb 18, 2027 | Pipeline Safety Audit Training | $2,150 | Register → |
| Feb 23 – Feb 25, 2027 | Advanced Pipeline Risk Assessment Workshop | $2,150 | Register → |
| Mar 23 – Mar 25, 2027 | DOT Pipeline Compliance Workshop | $2,150 | Register → |
WEBINAR RECORDING!
Unpacking the Key Updates in API RP 1170 & 1171, 2nd Edition
Unpacking the Key Updates in API RP 1170 & 1171, 2nd Edition
RCP and the Pipeline Safety Institute offered a free webinar exploring the 2nd Editions of API RP 1170, Design and Operation of Solution-mined Salt Caverns Used for Natural Gas Storage and API RP 1171, Functional Integrity of Natural Gas Storage in Depleted Hydrocarbon Reservoirs and Aquifer Reservoirs. Thank you to everyone who attended and participated in this informative webinar. The session recording is posted to our YouTube channel. Please watch, like, and subscribe to our channel!
New Workshop Alert!
Prepare Your Team for Pipeline Safety Audits with Confidence!
Our 3-day Pipeline Safety Audit Workshop is tailored for professionals responsible for the safe operation of hazardous liquid and natural gas pipelines. Designed for groups of 10-15 participants, this interactive training…
On-Site Training Request
We have conducted on-site training for oil and gas companies for over 25 years and can provide customized workshops for companies with groups of five or more.
We would welcome the opportunity to discuss our services with you.
Sincerely,
![]()
W. R. (Bill) Byrd, PE
President
RCP Inc.![]()


