RCP provides technical support to produce an uprate plan, as required by 49 CFR Part 192. The plan provides the documentation and required tasks to increase current maximum allowable operating pressure (MAOP). RCP has a comprehensive checklist that is used to ensure regulatory requirements are addressed. The final deliverable includes a completed checklist along with copies of records or notations used to validate closure of each item.

RCP's engineering team provided the technical expertise and attention to detail we needed to move our project forward. Their knowledge of pipeline regulations and practical approach made the entire process much easier.