• Skip to primary navigation
  • Skip to main content
  • Skip to footer
  • Call Us(713) 655-8080
  • Get in Touchmessage us
  • Client Accesssign-in

RCP Inc.

  • Home
  • Who We Are
    • About Us
    • Careers
  • What We Do
    • Compliance Programs
      • Operations & Maintenance
      • Control Room Management
      • Facility Response Plans and Integrated Contingency Plans
      • Operator Qualifications
      • Integrity Management Plans
      • Public Awareness
      • Damage Prevention Program
      • Underwater Inspection Procedures
      • PSM/Risk Management Plan
      • Spill Prevention Countermeasures & Control
    • Consulting Services
      • Jurisdictional Determination
      • Acquisition Due Diligence
      • Expert Witness
      • Pipeline Safety Management System
      • Audits
      • Agency Response Support
      • Training
    • Engineering Services
      • MAOP Reconfirmation
      • Pressure Test Services
      • Leak Detection Capabilities Evaluation
      • Emergency Flow Restriction Device Analysis
      • Relief Valve Capacity Evaluation
      • Uprate Studies
      • Conversion of Service Plans
      • Defect Analysis and Repair Plan
      • Root Cause Failure Analysis
      • Engineering Specifications
    • Integrity Management
      • Risk Management
      • ILI Program Management
      • ILI Data Analysis
      • IM Auditing & Compliance Verification
      • IMP Program Development & Maintenance
      • Program Development & Maintenance
      • HCA Analysis
      • Air Dispersion Modeling
      • Class Location
      • Spill Modeling
      • GIS and Mapping Services
      • Threat Analysis
      • Underground Gas Storage
      • Ongoing Integrity Management Support Services
  • Newsletter
    • Current Newsletter
    • Search Newsletter
    • Subscribe
  • Tools
    • Pressure Test Certification
    • MAOP Reconfirmation
    • Pipeline Incident Data
    • Asset Management Tracking System
  • TaskOp
    • Asset Management Tracking System
    • Modules
    • Test Drive
    • Newsletter
  • Pressure Testing
    • TestOp – Transmission Pipelines
      • Overview – Pressure Test Validation
      • Feature List
      • TestOp – FAQ
    • TestApp – Distribution Pipelines
    • Training
      • Pressure Test Training Course
      • TestOp – User Training
    • Testimonials
      • TestOp Testimonials
  • Methane
    • MethOp
    • Request Demo
  • Training
    • DOT Pipeline Compliance Workshop
    • Mega Rule #1: Gas Transmission Regulation Deep Dive Virtual Workshop
    • Unpacking the New Gas Gathering Rule
    • Pressure Testing
    • On-Site Customized Training
    • Calendar of Events
  • Contact Us
Search Open Menu

In This Issue

  1. PHMSA Advisory Bulletin (ADB-2014-05) Guidance for Strengthening Pipeline Safety through Rigorous Program Evaluation & Meaningful Metrics
  2. PHMSA Revised O&M Enforcement Guidance
  3. Audit Assistance
  4. PHMSA Study of Impact of One-Call Exemptions
  5. Damage Prevention Plans
  6. API RP1173 Draft Pipeline Safety Management System
  7. Illinois Pipeline Regulation Update
  8. Bored Reading the Federal Register? Try Texas.
  9. TRRC Chapter 8 Pipeline Safety Adopts Farm Tap Regulations
  10. PHMSA NPMS Public Meeting
  11. Pipeline Safety Trust Meeting
  12. Underwater Inspection Procedures & Inspection Interval Risk Model Updates
  13. Pipeline Pressure Testing Workshop: January 13-14, 2015
  14. Pressure Test Certification
  15. Pipeline Training Reference Museum

API RP1173 Draft Pipeline Safety Management System

A final draft is ready for approval and public comment on the Pipeline Safety Management System Recommended Practice (RP), API 1173 (PSMS). This is the second ballot and will result in a new document (1st Edition). Comments are due by December 20, 2014 and will be accepted online at http://ballots.api.org/login.aspx. The ballot ID number is 3392. See our related article in the July 2014 edition of the DOT Pipeline Compliance News for detailed information about how to download and vote on the ballot.

« Previous Article
Full Issue
November 2014 Issue
Next Article »

Footer

Top

Contact

RCP Inc.
801 Louisiana Street, Suite 200
Houston, TX 77002

(713) 655-8080

info@rcp.com

Recent Newsletters

  • November
  • October
  • September

Subscribe to our DOT Pipeline Compliance Newsletter

  • Home
  • Who We Are
    • About Us
    • Careers
  • What We Do
    • Compliance Programs
      • Operations & Maintenance
      • Control Room Management
      • Facility Response Plans and Integrated Contingency Plans
      • Operator Qualifications
      • Integrity Management Plans
      • Public Awareness
      • Damage Prevention Program
      • Underwater Inspection Procedures
      • PSM/Risk Management Plan
      • Spill Prevention Countermeasures & Control
    • Consulting Services
      • Jurisdictional Determination
      • Acquisition Due Diligence
      • Expert Witness
      • Pipeline Safety Management System
      • Audits
      • Agency Response Support
      • Training
    • Engineering Services
      • MAOP Reconfirmation
      • Pressure Test Services
      • Leak Detection Capabilities Evaluation
      • Emergency Flow Restriction Device Analysis
      • Relief Valve Capacity Evaluation
      • Uprate Studies
      • Conversion of Service Plans
      • Defect Analysis and Repair Plan
      • Root Cause Failure Analysis
      • Engineering Specifications
    • Integrity Management
      • Risk Management
      • ILI Program Management
      • ILI Data Analysis
      • IM Auditing & Compliance Verification
      • IMP Program Development & Maintenance
      • Program Development & Maintenance
      • HCA Analysis
      • Air Dispersion Modeling
      • Class Location
      • Spill Modeling
      • GIS and Mapping Services
      • Threat Analysis
      • Underground Gas Storage
      • Ongoing Integrity Management Support Services
  • Newsletter
    • Current Newsletter
    • Search Newsletter
    • Subscribe
  • Tools
    • Pressure Test Certification
    • MAOP Reconfirmation
    • Pipeline Incident Data
    • Asset Management Tracking System
  • TaskOp
    • Asset Management Tracking System
    • Modules
    • Test Drive
    • Newsletter
  • Pressure Testing
    • TestOp – Transmission Pipelines
      • Overview – Pressure Test Validation
      • Feature List
      • TestOp – FAQ
    • TestApp – Distribution Pipelines
    • Training
      • Pressure Test Training Course
      • TestOp – User Training
    • Testimonials
      • TestOp Testimonials
  • Methane
    • MethOp
    • Request Demo
  • Training
    • DOT Pipeline Compliance Workshop
    • Mega Rule #1: Gas Transmission Regulation Deep Dive Virtual Workshop
    • Unpacking the New Gas Gathering Rule
    • Pressure Testing
    • On-Site Customized Training
    • Calendar of Events
  • Contact Us