• Skip to primary navigation
  • Skip to main content
  • Skip to footer
  • Call Us(713) 655-8080
  • Get in Touchmessage us
  • Client Accesssign-in

RCP Inc.

  • Home
  • Who We Are
    • About Us
    • Careers
  • What We Do
    • Compliance Programs
      • Operations & Maintenance
      • Control Room Management
      • Facility Response Plans and Integrated Contingency Plans
      • Operator Qualifications
      • Integrity Management Plans
      • Public Awareness
      • Damage Prevention Program
      • Underwater Inspection Procedures
      • PSM/Risk Management Plan
      • Spill Prevention Countermeasures & Control
    • Consulting Services
      • Jurisdictional Determination
      • Acquisition Due Diligence
      • Expert Witness
      • Pipeline Safety Management System
      • Audits
      • Agency Response Support
      • Training
    • Engineering Services
      • MAOP Reconfirmation
      • Pressure Test Services
      • Leak Detection Capabilities Evaluation
      • Emergency Flow Restriction Device Analysis
      • Relief Valve Capacity Evaluation
      • Uprate Studies
      • Conversion of Service Plans
      • Defect Analysis and Repair Plan
      • Root Cause Failure Analysis
      • Engineering Specifications
    • Integrity Management
      • Risk Management
      • ILI Program Management
      • ILI Data Analysis
      • IM Auditing & Compliance Verification
      • IMP Program Development & Maintenance
      • Program Development & Maintenance
      • HCA Analysis
      • Air Dispersion Modeling
      • Class Location
      • Spill Modeling
      • GIS and Mapping Services
      • Threat Analysis
      • Underground Gas Storage
      • Ongoing Integrity Management Support Services
  • Newsletter
    • Current Newsletter
    • Search Newsletter
    • Subscribe
  • Tools
    • Pressure Test Certification
    • MAOP Reconfirmation
    • Pipeline Incident Data
    • Asset Management Tracking System
  • TaskOp
    • Asset Management Tracking System
    • Modules
    • Test Drive
    • Newsletter
  • Pressure Testing
    • TestOp – Transmission Pipelines
      • Overview – Pressure Test Validation
      • Feature List
      • TestOp – FAQ
    • TestApp – Distribution Pipelines
    • Training
      • Pressure Test Training Course
      • TestOp – User Training
    • Testimonials
      • TestOp Testimonials
  • Methane
    • MethOp
    • Request Demo
  • Training
    • DOT Pipeline Compliance Workshop
    • Mega Rule #1: Gas Transmission Regulation Deep Dive Virtual Workshop
    • Unpacking the New Gas Gathering Rule
    • Pressure Testing
    • On-Site Customized Training
    • Calendar of Events
  • Contact Us
Search Open Menu

In This Issue

  1. PHMSA NPRM: OQ, Cost Recovery, Accident and Incident Notification, and Other Pipeline Safety Proposed Changes
  2. PHMSA Advisory Bulletin ADB-2015-02: Potential for Damage to Pipeline Facilities Caused by Hurricanes
  3. Pressure Test WebEx
  4. Gas Distribution Annual Report Form
  5. Pipeline Pressure Testing Workshop: August 4-5, 2015
  6. Revised PHMSA OpID Assignment Request and Operator Registry Notification
  7. PHMSA Pipeline Data & Stats Website and Incident Flagged File Change
  8. DOT Pipeline Compliance Workshop – Gas & Liquid
  9. PHMSA Report to Congress: Review of Existing Federal and State Regulations for Gas and Hazardous Liquid Gathering Lines
  10. Storage Tanks in West Virginia – Proposed Rule
  11. API Publishes API 1173 Recommended Practice for Pipeline Safety Management Systems
  12. Jurisdictional Determination
  13. PHMSA Risk Modeling Methodologies Public Workshop
  14. P&GJ Pipeline Integrity Issue
  15. Summer/Fall Conference Schedule
  16. Save the Dates!

Gas Distribution Annual Report Form

PHMSA F7100.1-1 (rev 5-2015)

PHMSA posted an updated Gas Distribution Annual Report Form F7100.1-1 for the submission of calendar year 2015 data in 2016. Updates to the form include:

  • addition of “Reconditioned Cast Iron” as a material specification for reporting pipeline mileage;
  • operators can differentiate between historic cast iron mileage and mileage that has been modified;
  • Part D – Excavation Damage: operators will be able to identify the root causes of excavation damage.
« Previous Article
Full Issue
July 2015 Issue
Next Article »

Footer

Top

Contact

RCP Inc.
801 Louisiana Street, Suite 200
Houston, TX 77002

(713) 655-8080

info@rcp.com

Recent Newsletters

  • March
  • February
  • January

Subscribe to our DOT Pipeline Compliance Newsletter

  • Home
  • Who We Are
    • About Us
    • Careers
  • What We Do
    • Compliance Programs
      • Operations & Maintenance
      • Control Room Management
      • Facility Response Plans and Integrated Contingency Plans
      • Operator Qualifications
      • Integrity Management Plans
      • Public Awareness
      • Damage Prevention Program
      • Underwater Inspection Procedures
      • PSM/Risk Management Plan
      • Spill Prevention Countermeasures & Control
    • Consulting Services
      • Jurisdictional Determination
      • Acquisition Due Diligence
      • Expert Witness
      • Pipeline Safety Management System
      • Audits
      • Agency Response Support
      • Training
    • Engineering Services
      • MAOP Reconfirmation
      • Pressure Test Services
      • Leak Detection Capabilities Evaluation
      • Emergency Flow Restriction Device Analysis
      • Relief Valve Capacity Evaluation
      • Uprate Studies
      • Conversion of Service Plans
      • Defect Analysis and Repair Plan
      • Root Cause Failure Analysis
      • Engineering Specifications
    • Integrity Management
      • Risk Management
      • ILI Program Management
      • ILI Data Analysis
      • IM Auditing & Compliance Verification
      • IMP Program Development & Maintenance
      • Program Development & Maintenance
      • HCA Analysis
      • Air Dispersion Modeling
      • Class Location
      • Spill Modeling
      • GIS and Mapping Services
      • Threat Analysis
      • Underground Gas Storage
      • Ongoing Integrity Management Support Services
  • Newsletter
    • Current Newsletter
    • Search Newsletter
    • Subscribe
  • Tools
    • Pressure Test Certification
    • MAOP Reconfirmation
    • Pipeline Incident Data
    • Asset Management Tracking System
  • TaskOp
    • Asset Management Tracking System
    • Modules
    • Test Drive
    • Newsletter
  • Pressure Testing
    • TestOp – Transmission Pipelines
      • Overview – Pressure Test Validation
      • Feature List
      • TestOp – FAQ
    • TestApp – Distribution Pipelines
    • Training
      • Pressure Test Training Course
      • TestOp – User Training
    • Testimonials
      • TestOp Testimonials
  • Methane
    • MethOp
    • Request Demo
  • Training
    • DOT Pipeline Compliance Workshop
    • Mega Rule #1: Gas Transmission Regulation Deep Dive Virtual Workshop
    • Unpacking the New Gas Gathering Rule
    • Pressure Testing
    • On-Site Customized Training
    • Calendar of Events
  • Contact Us