On May 15, 2013 the Missouri Public Service Commission updated their gas pipeline regulations found in the Code of State Regulations (CSR) Title 4 Division 240 Chapter 40 Gas Utilities and Gas Safety Standards. In addition to editorial changes, the following more significant changes were made:
4 CSR 240-40.020 Incident, Annual and Safety-Related Condition Reporting
- Exempted pipelines that operate at less than 0 psi and pipelines that are not a regulated onshore gathering line (as determined in 4 CSR 240-40-030(1)(E)).
- Updated the definition of an incident to exclude the cost of gas from the $50,000 reporting threshold and add a three million cubic feet threshold for reporting unintentional estimated gas loss.
- Rather than requiring a telephonic report, an immediate notification must be made to the National Response Center by either telephone or electronically at NRC.USCG.MIL
- Updated PHMSA reporting requirements to match the report submission requirements found in 49 CFR 191.
- Require a federal incident report be filed within 30 days after detection of an incident on the incident form revised June 2011.
- Added requirements for Mechanical Fitting Failure Reports to the requirements for filing distribution system annual reports.
- Added requirements for obtaining OPID and reporting changes.
4 CSR 240-40.030 Safety Standards – Transportation of Gas by Pipeline.
- Added definitions for active corrosion, electrical survey, PHMSA, Pipeline Environment, and Service line serving single-family residence.
- Added control room management procedures and distribution integrity management plans as procedures and plans that must be submitted to the designated commission personnel.
- Updated the requirements, to match those in the Federal Regulations, for transporting pipe.
- Specifically states 49 CFR 192.123(e) and (f) are not incorporated due to the fact that they permit higher design pressures for certain types of thermoplastic pipe.
- Forbids valves having a shell body made of cast iron, malleable iron or ductile iron from being used in gas pipe components of compressor stations.
- Added requirements for installation of excess flow valves in any new or replaced service line serving a single-family residence after February 12, 2010 unless stated exemptions are met.
- Added requirements for the Operations and Maintenance Manual to include procedures for implementing the applicable control room management procedures required.
- Added requirements for adding actions required to be taken by a controller during an emergency in accordance with control room management requirements.
- Provides requirements for master meter operators to develop and implement procedures to provide customers public awareness messages twice annually in lieu of a full public awareness program.
- Added Control Room Management requirements.
- Updated requirements for permanent repairs for non-integrity and integrity management repairs.
- Updates to the pipeline integrity management for transmission lines.
- Added requirements for gas distribution integrity management.
For a copy of the Missouri updated regulations, contact Jessica Roger