• Skip to primary navigation
  • Skip to main content
  • Skip to footer
  • Call Us(713) 655-8080
  • Get in Touchmessage us
  • Client Accesssign-in

RCP Inc.

  • Home
  • Who We Are
    • About Us
    • Careers
  • What We Do
    • Compliance Programs
      • Operations & Maintenance
      • Control Room Management
      • Facility Response Plans and Integrated Contingency Plans
      • Operator Qualifications
      • Integrity Management Plans
      • Public Awareness
      • Damage Prevention Program
      • Underwater Inspection Procedures
      • PSM/Risk Management Plan
      • Spill Prevention Countermeasures & Control
    • Consulting Services
      • Jurisdictional Determination
      • Acquisition Due Diligence
      • Expert Witness
      • Pipeline Safety Management System
      • Audits
      • Agency Response Support
      • Training
    • Engineering Services
      • MAOP Reconfirmation
      • Pressure Test Services
      • Leak Detection Capabilities Evaluation
      • Emergency Flow Restriction Device Analysis
      • Relief Valve Capacity Evaluation
      • Uprate Studies
      • Conversion of Service Plans
      • Defect Analysis and Repair Plan
      • Root Cause Failure Analysis
      • Engineering Specifications
    • Integrity Management
      • Risk Management
      • ILI Program Management
      • ILI Data Analysis
      • IM Auditing & Compliance Verification
      • IMP Program Development & Maintenance
      • Program Development & Maintenance
      • HCA Analysis
      • Air Dispersion Modeling
      • Class Location
      • Spill Modeling
      • GIS and Mapping Services
      • Threat Analysis
      • Underground Gas Storage
      • Ongoing Integrity Management Support Services
  • Newsletter
    • Current Newsletter
    • Search Newsletter
    • Subscribe
  • Tools
    • Pressure Test Certification
    • MAOP Reconfirmation
    • Pipeline Incident Data
    • Asset Management Tracking System
  • TaskOp
    • Asset Management Tracking System
    • Modules
    • Test Drive
    • Newsletter
  • Pressure Testing
    • TestOp – Transmission Pipelines
      • Overview – Pressure Test Validation
      • Feature List
      • TestOp – FAQ
    • TestApp – Distribution Pipelines
    • Training
      • Pressure Test Training Course
      • TestOp – User Training
    • Testimonials
      • TestOp Testimonials
  • Methane
    • MethOp
    • Request Demo
  • Training
    • DOT Pipeline Compliance Workshop
    • Mega Rule #1: Gas Transmission Regulation Deep Dive Virtual Workshop
    • Unpacking the New Gas Gathering Rule
    • Pressure Testing
    • On-Site Customized Training
    • Calendar of Events
  • Contact Us
Search Open Menu

In This Issue

  1. Underground Natural Gas Storage Interim Final Rule
  2. Underground Gas Storage Compliance
  3. Underground Gas Storage FAQs
  4. New Associate Administrator for OPS
  5. PHMSA Claims Enforcement Jurisdiction in 5 States Over 3rd Party Excavators
  6. PHMSA Pipeline Safety Information Collection Activities
  7. High Consequence Area Identification Methods Advisory Bulletin (ADB-2016-07)
  8. GIS Services
  9. PHMSA Advisory ADB-2016-06 Safeguarding and Securing Pipelines from Unauthorized Access
  10. PHMSA Projected Rulemaking Dates
  11. Gas Transmission
  12. Random Drug Testing Rate, etc.
  13. Misc. Pipeline Regulation Updates in Florida
  14. New York Regulation Updates
  15. North Dakota Approved Safety Rules for Underground Crude Oil & Produced Water Gathering Lines
  16. Pressure Testing Webinar – Advantages of Using TestOp®
  17. 2017 Pipeline Conference News
  18. Save the Dates! RCP Workshop Schedule for 2017
  19. HAWC Annual Race Against Violence

New York Regulation Updates

On December 30, 2016 the New York Department of Public Service updated their gas, hazardous liquid, liquefied natural gas and drug and alcohol testing regulations to better align with the requirements of the applicable federal regulations. As part of this update, Title 16 Chapter III Part 255 Section 559 concerning conversion of pipelines to jurisdiction under these regulations was renumbered as Section 14. Lastly, these changes repealed Section 61 concerning Copper Pipe, Section 237 Preheating and Section 239 Stress Relieving.

« Previous Article
Full Issue
January 2017 Issue
Next Article »

Footer

Top

Contact

RCP Inc.
801 Louisiana Street, Suite 200
Houston, TX 77002

(713) 655-8080

info@rcp.com

Recent Newsletters

  • March
  • February
  • January

Subscribe to our DOT Pipeline Compliance Newsletter

  • Home
  • Who We Are
    • About Us
    • Careers
  • What We Do
    • Compliance Programs
      • Operations & Maintenance
      • Control Room Management
      • Facility Response Plans and Integrated Contingency Plans
      • Operator Qualifications
      • Integrity Management Plans
      • Public Awareness
      • Damage Prevention Program
      • Underwater Inspection Procedures
      • PSM/Risk Management Plan
      • Spill Prevention Countermeasures & Control
    • Consulting Services
      • Jurisdictional Determination
      • Acquisition Due Diligence
      • Expert Witness
      • Pipeline Safety Management System
      • Audits
      • Agency Response Support
      • Training
    • Engineering Services
      • MAOP Reconfirmation
      • Pressure Test Services
      • Leak Detection Capabilities Evaluation
      • Emergency Flow Restriction Device Analysis
      • Relief Valve Capacity Evaluation
      • Uprate Studies
      • Conversion of Service Plans
      • Defect Analysis and Repair Plan
      • Root Cause Failure Analysis
      • Engineering Specifications
    • Integrity Management
      • Risk Management
      • ILI Program Management
      • ILI Data Analysis
      • IM Auditing & Compliance Verification
      • IMP Program Development & Maintenance
      • Program Development & Maintenance
      • HCA Analysis
      • Air Dispersion Modeling
      • Class Location
      • Spill Modeling
      • GIS and Mapping Services
      • Threat Analysis
      • Underground Gas Storage
      • Ongoing Integrity Management Support Services
  • Newsletter
    • Current Newsletter
    • Search Newsletter
    • Subscribe
  • Tools
    • Pressure Test Certification
    • MAOP Reconfirmation
    • Pipeline Incident Data
    • Asset Management Tracking System
  • TaskOp
    • Asset Management Tracking System
    • Modules
    • Test Drive
    • Newsletter
  • Pressure Testing
    • TestOp – Transmission Pipelines
      • Overview – Pressure Test Validation
      • Feature List
      • TestOp – FAQ
    • TestApp – Distribution Pipelines
    • Training
      • Pressure Test Training Course
      • TestOp – User Training
    • Testimonials
      • TestOp Testimonials
  • Methane
    • MethOp
    • Request Demo
  • Training
    • DOT Pipeline Compliance Workshop
    • Mega Rule #1: Gas Transmission Regulation Deep Dive Virtual Workshop
    • Unpacking the New Gas Gathering Rule
    • Pressure Testing
    • On-Site Customized Training
    • Calendar of Events
  • Contact Us