DOT Pipeline Compliance Workshop – February 25 & 26, 2009
RCP will be hosting our very popular 2-day workshop on DOT Pipeline Compliance on February 25 & 26, 2009, in Houston, TX. Join us for an informative, lively, and interactive workshop on DOT Pipeline Compliance.
Day 1 (February 25): Gas Pipeline Regulations (49CFR192): Covering all the topics below but special emphasis will be placed on the changes in **GAS GATHERING** regulations.
Day 2 (February 26): Liquid Pipeline Regulations (49CFR195)
Each day of the workshop will address the following issues as they specifically relate to either Gas or Hazardous Liquid pipelines:
- PHMSA Overview
- PHMSA Jurisdictional Boundaries
- Compliance Requirements:
- New/Proposed Regulations – including liquid rural low stress and new gas production pipeline rules in Texas and other states.
For additional information go to our website here.
Save the Dates!
RCP DOT Workshops in 2009
February 25 & 26 (Wednesday & Thursday) – Houston, TX
June 2 & 3 (Tuesday & Wednesday) – Houston, TX
October 6 & 7 (Tuesday & Wednesday) – Houston, TX
Visit our Seminars webpage for updates & registration information.
Delay of Effective Date for MAOP Rule Changes
On October 17, 2008, the Department of Transportation / Pipeline Hazardous Materials Safety Administration (PHMSA) issued a final rule amending the Pipeline Safety Regulations to increase the regulatory maximum allowable operating pressure (MAOP) for certain gas transmission pipelines. (See related article in the November 2008 Edition of the DOT Pipeline Compliance News.) The original effective date of November 17, 2008 has been delayed to December 22, 2008.
Because the final rule is a major rule within the meaning of the Congressional Review Act, the effective date must be delayed until 60 days after publication in the Federal Register or transmission to Congress, whichever is later. The final rule was transmitted to Congress on October 22, 2008. Accordingly, PHMSA is delaying the rule’s effective date until December 22, 2008.
PHMSA Liquid Pipeline Internal Corrosion Advisory Bulletin
ADB-08-08
On November 17, 2008, The Department of Transportation / Pipeline Hazardous Materials Safety Administration (PHMSA) issued Advisory Bulletin 08-08 (ADB-08-08) to hazardous liquid pipeline operators. The preamble to the bulletin also stated that PHMSA will conduct a workshop on internal corrosion on hazardous liquid pipelines in the first quarter of 2009. Information on this workshop will be posted on the PHMSA Web site.
PHMSA is advising operators of hazardous liquid transmission pipelines to review and analyze the following risk factors to determine if the commodity transported could corrode the pipeline:
- Type of commodity;
- Flow rate;
- Velocity;
- Operating Pressure;
- Topography;
- Amount of foreign material and/or contaminants present in the pipeline and/or commodity stream such as sand, silt, water, or other materials that could cause or promote internal corrosion;
- Amount of sulfur, salts, acids, hydrogen sulfide, carbon dioxide or other corrosive material present and corrosive effect based upon partial pressures of material in the pipeline;
- Presence of microbes;
- Temperature;
- Pipe configuration, design, and material specifications;
- Operating conditions, including but not limited to, steady state conditions, slack line conditions, upset conditions in the pipeline system, and upset conditions in upstream facilities such as refineries or processing facilities; and
- Any other circumstance or condition that could cause, promote, or increase the likelihood of internal corrosion.
Significant changes to any of the above risk factors and considerations must be promptly reflected in a revised analysis. In accordance with 49 CFR 195.589(c), you must maintain a record of the above analysis required by 49 CFR 195.579(a) in sufficient detail to demonstrate the adequacy of corrosion control measures or that corrosion control measures are not necessary. Records must be retained for at least five years and they must be readily available for inspection.
PHMSA Extends Comment Period on Draft Report on Mechanical Damage to Pipelines
The Department of Transportation / Pipeline Hazardous Materials Safety Administration (PHMSA) issued a draft report on mechanical damage to pipelines. The study is a compilation of industry practices and also captures what is being done in the way of damage prevention. The study is a culmination of a public workshop on mechanical damage that was conducted by PHMSA in early 2006. PHMSA has extended the comment period from November 14 until January 15, 2009. Comments can still be submitted to: cmayernik@mbakercorp.com.
EPA Revision to the Regulatory Definition of “Navigable Waters”
The Environmental Protection Agency (EPA) has promulgated a final rule to amend a Clean Water Act (CWA) section 311 regulation that defines the term "navigable waters." This final rule restores the 1973 SPCC rule definition of "navigable waters", as required by a recent court decision, and replaces the definition that the EPA promulgated in 2002. The final rule amends 40 CFR § 112.2 by revising the definition of "navigable waters" to read as follows:
§ 112.2 Definitions. Navigable waters of the United States means "navigable waters" as defined in section 502(7) of the FWPCA, and includes:
- All navigable waters of the United States, as defined in judicial decisions prior to passage of the 1972 Amendments to the FWPCA (Pub. L. 92-500), and tributaries of such waters;
- Interstate waters;
- Intrastate lakes, rivers, and streams which are utilized by interstate travelers for recreational or other purposes; and
- Intrastate lakes, rivers, and streams from which fish or shellfish are taken and sold in interstate commerce.
This rule is effective November 26, 2008.
EPA Proposal to Amend and Extend SPCC Compliance Dates
The Environmental Protection Agency (EPA) has proposed to amend the dates by which facilities must prepare or amend Spill Prevention, Control, and Countermeasure (SPCC) Plans, and implement those Plans. This proposed rule would amend the dates in § 112.3(a), (b) and (c) by which facilities must prepare or amend their SPCC Plans, and implement those Plans to establish a date one year from promulgation of the final rule amending 40 CFR part 112. Two different extension dates are also proposed for farms and production facilities that meet the qualified facilities criteria in § 112.3(g). Qualified facilities that are farms or production facilities would have two or five years respectively from promulgation of the final rule amending 40 CFR part 112 published elsewhere in this Federal Register.
Under the proposed revision to § 112.3(a)(1), the owner or operator of a facility that was in operation on or before August 16, 2002 would be required to make any necessary amendments to its SPCC Plan and fully implement it by November 20, 2009, while the owner or operator of a facility that came into operation after August 16, 2002, but before November 20, 2009, would be required to prepare and fully implement an SPCC Plan on or before November 20, 2009.
Under the proposed revision to § 112.3(b)(1), the owner or operator of a facility that becomes operational after November 20, 2009 would be required to prepare and implement an SPCC Plan before beginning operations. This rule similarly proposes to extend the compliance date in § 112.3(c) for mobile facilities. An owner or operator of a mobile facility would be required to prepare or amend and implement an SPCC Plan on or after November 20, 2009, or before beginning operations if operations begin after November 20, 2009.
Written comments must be received by December 26, 2008 and may be submitted to the E-Gov Web Site: http://www.regulations.gov. Reference Docket ID No. EPA-HQ-OPA-2008-0546.
Comprehensive SPCC Rule Changes – Final Rule
EPA-HQ-OPA-2007-0584; FRL-8746-3
The Environmental Protection Agency (EPA) has amended the Spill Prevention, Control, and Countermeasure (SPCC) rule in order to provide increased clarity, to tailor requirements to particular industry sectors, and to streamline certain requirements for those facility owners or operators subject to the rule, which should result in greater protection to human health and the environment. Specifically, this final rule:
- Exempts hot-mix asphalt (HMA), pesticide application equipment and related mix containers, and heating oil containers at single-family residences from the SPCC rule;
- amends the definition of “facility” to clarify the existing flexibility associated with describing a facility’s boundaries; amends the facility diagram requirement to provide additional flexibility;
- defines “loading/unloading rack” to clarify the equipment subject to the provisions for facility tank car and tank truck loading/unloading racks, as well as amends the provisions for this equipment;
- provides streamlined requirements for a subset of qualified facilities;
- amends the general secondary containment requirement to provide more clarity;
- exempts non-transportation-related tank trucks from the sized secondary containment requirements; amends the security requirements;
- amends the integrity testing requirements to allow greater flexibility in the use of industry standards;
- amends the integrity testing requirements for containers that store animal fats or vegetable oils and meet certain criteria;
- streamlines a number of requirements for onshore oil production facilities; and
- exempts underground oil storage tanks at nuclear power generation facilities.
EPA is also providing clarification in the preamble to this final rule on additional issues raised by the regulated community and, in a separate action in the Federal Register of November 26, 2008, (73 FR 72016), the Agency is proposing a new compliance date for farms.
This final rule is effective February 3, 2009. For a copy of the SPCC Final Rule, contact Jessica Roger.
SPCC Plans
Did you know RCP has developed or modified hundreds of SPCC plans, including plans for some of the biggest facilities in America? Major oil and gas companies think of us when they need SPCC plan support. Shouldn’t your company? Click here for more information.
MMS NTL No. 2008-G23 Damage from Hurricanes Gustav and Ike
The Minerals Management Service (MMS) has issued NTL No. 2008-G23, effective November 20, 2008, which states the following:
Pursuant to 30 CFR 250.1014, a pipeline right-of-way (ROW) will expire if the associated pipeline is not properly maintained or is not being used for the purpose for which the grant was made. However, the MMS Gulf of Mexico OCS Region (GOMR) recognizes that many ROW pipelines sustained damage from Hurricanes Gustav and/or Ike and, for that reason, cannot at this time be properly maintained or used for the purposes for which the respective grants were made. Accordingly, any pipeline ROW associated with a pipeline that cannot be properly maintained or used for the purpose for which the grant was made due to damage caused by either Hurricane Gustav or Hurricane Ike will not expire for either of those reasons during the one-year period beginning November 20, 2008.
Pipeline Safety Trust Presentations
The Pipeline Safety Trust has posted presentations from last month’s conference in New Orleans. This meeting is unique in that there are always opinions expressed and positions presented from all angles of pipeline safety. It had lots of good discussion on data, damage prevention, and expansion of pipeline capacity concerns by the public. For more information, go to http://www.pstrust.org/conference/2008/2008presentations.htm.
These articles are maintained and updated as new information becomes available.
Regulatory Watch: Key Dates & Deadlines
Track PHMSA rulemaking, regulatory stages, and important compliance deadlines in RCP's Regulatory Watch.
View Full Regulatory Watch →Conference News
Pipeline Pigging and Integrity Management Conference
The 39th International Pipeline Pigging & Integrity Management Conference (PPIM) will take place at the George R. Brown Convention Center in Houston. The event brings together pipeline operators, engineers, and industry professionals to explore advancements in pipeline inspection, integrity management, risk assessment, and emerging technologies.…
RCP Team Attending
Heather Roark
Jessica FoleyPSI Training Schedule

| Date | Training Course | Price | Registration |
|---|---|---|---|
| Nov 17 – Nov 19, 2026 | DOT Pipeline Compliance Workshop | $2,150 | SOLD OUT |
| Feb 16 – Feb 18, 2027 | Pipeline Safety Audit Training | $2,150 | Register → |
| Feb 23 – Feb 25, 2027 | Advanced Pipeline Risk Assessment Workshop | $2,150 | Register → |
| Mar 23 – Mar 25, 2027 | DOT Pipeline Compliance Workshop | $2,150 | Register → |
WEBINAR RECORDING!
Unpacking the Key Updates in API RP 1170 & 1171, 2nd Edition
Unpacking the Key Updates in API RP 1170 & 1171, 2nd Edition
RCP and the Pipeline Safety Institute offered a free webinar exploring the 2nd Editions of API RP 1170, Design and Operation of Solution-mined Salt Caverns Used for Natural Gas Storage and API RP 1171, Functional Integrity of Natural Gas Storage in Depleted Hydrocarbon Reservoirs and Aquifer Reservoirs. Thank you to everyone who attended and participated in this informative webinar. The session recording is posted to our YouTube channel. Please watch, like, and subscribe to our channel!
New Workshop Alert!
Prepare Your Team for Pipeline Safety Audits with Confidence!
Our 3-day Pipeline Safety Audit Workshop is tailored for professionals responsible for the safe operation of hazardous liquid and natural gas pipelines. Designed for groups of 10-15 participants, this interactive training…
On-Site Training Request
We have conducted on-site training for oil and gas companies for over 25 years and can provide customized workshops for companies with groups of five or more.
Season’s Greetings from RCP!
RCP would like to thank our valued clients for a wonderful year. We appreciate the opportunities you have given us to serve as your Professional Engineers, Regulatory Experts, and Trusted Partners. We look forward to working with you on even more projects in the years ahead. Best wishes for the holiday season and the New Year, from your friends at RCP.
Sincerely,
![]()
W. R. (Bill) Byrd, PE
President
RCP Inc.
- DOT Pipeline Compliance Workshop – February 25 & 26, 2009
- Delay of Effective Date for MAOP Rule Changes
- PHMSA Liquid Pipeline Internal Corrosion Advisory Bulletin
- PHMSA Extends Comment Period on Draft Report on Mechanical Damage to Pipelines
- EPA Revision to the Regulatory Definition of “Navigable Waters”
- EPA Proposal to Amend and Extend SPCC Compliance Dates
- Comprehensive SPCC Rule Changes – Final Rule
- MMS NTL No. 2008-G23 Damage from Hurricanes Gustav and Ike
- Pipeline Safety Trust Presentations
- Regulatory Watch: Key Dates & Deadlines
- Conference News
- PSI Training Schedule