PHMSA Extends Public Comment Period for Proposed Pipeline Safety Measures

[Docket No.: PHMSA–2022–0085]

PHMSA has extended the public comment period for a notice published on March 25, 2024 (89 FR 20751), which requested feedback on proposed changes to PHMSA forms. These changes aim to gather data on the use of rupture mitigation valves and blending hydrogen gas with other natural gases in pipelines. These adjustments are intended to address Recommendation P-11-11 from the National Transportation Safety Board and track trends related to gas pipeline operations.

In response to a joint petition from trade associations, the deadline for public comments has been extended from May 24, 2024, to June 24, 2024. This extension was announced on May 3, 2024, and published in the Federal Register on May 6, 2024.

For a copy of this notice, please message Jessica Foley.

The Enforcement Corner

The Enforcement Corner summarizes recent PHMSA enforcement actions, indicating where PHMSA is putting its enforcement efforts and the fines they are proposing for various types of violations.

In March 2024, PHMSA issued 7 NOAs, 7 NOPVs, and 6 WLs accompanied by $353,300 in proposed fines. Significant proposed fines were attributed to the following code sections: 

  • $34,200 49 CFR 195.446(c)(3) Control Room Management 
  • $33,500 49 CFR 195.446(c)(4) Control Room Management 
  • $33,500 49 CFR 195.446(e)(4) Control Room Management 
  • $33,500 49 CFR 195.446(h)(1) Control Room Management 
  • $1,800 49 CFR 195.505(b) Operator Qualification 
  • $39,400 49 CFR 195.446(c)(4) Overpressure Safety Devices 
  • $137,600 49 CFR 195.446(c)(4) Procedure Manual 
  • $39,800 49 CFR 195.446(c)(4) Drug Testing 

Please note: 

  1. Pipeline operators may disagree in whole or in part with each proposed violation cited by PHMSA.  
  2. Proposed Civil Penalties (PCP) may be reduced or eliminated before an enforcement action becomes final. 
  3. A Corrective Action Order (CAO) usually addresses urgent situations arising out of an accident, spill, or other significant, immediate, or imminent safety or environmental concerns. 
  4. A Notice of Amendment (NOA) is frequently a result of a difference of opinion regarding written procedure requirements. 
  5. A Notice of Proposed Safety Order (NOPSO) addresses pipeline integrity risks that may not constitute a hazardous facility requiring immediate corrective action (see Corrective Action Order described above), but do need to be addressed over time. 
  6. A Notice of Probable Violation (NOPV) is not proof that a violation actually occurred. 
  7. Proposed Compliance Orders (PCO) frequently document actions the pipeline operator already planned to do. 
  8. Warning Letter (WL) is an official notice by PHMSA that an operator needs to make improvements but that no further enforcement is proposed for those findings at this time. 

 

 

 

 

 

 

RCP maintains a detailed database of all PHMSA enforcement actions dating back to 2007 and is routinely asked for data analysis of various enforcement actions. For more information on how RCP can assist with enforcement action data analysis services, contact Jessica Foley. 

Need to respond to a PHMSA enforcement action?
Need to know if your enforcement action is an outlier, or par for the course? 

RCP maintains a detailed database of all PHMSA enforcement actions and their resolution which enables us to compare and contrast individual enforcement actions to nationwide actions and trends.  We can help put things into context to ensure an effective reply for each citation.  For more information on how RCP can assist with enforcement action data analysis services, contact Jessica Foley.

Did you know?

Natural gas is critical to maintaining electric reliability in the U.S. As the largest source of electricity in the United States, natural gas accounted for nearly 40% of the kilowatt hours of electricity produced in the U.S. in 2022. Some power plants use natural gas to power steam boilers, combustion turbines, or both, which then generate the electricity which is carried through the power grid long distances to residential and commercial buildings and industrial facilities. The United States currently has 2,077 natural gas-fired power plants. However, the Energy Information Administration (EIA) expects that the U.S. will add 10 natural gas-fired power plants with 1.8 GW of capacity in 2024.  Read more: https://ingaa.org/role-of-pipelines-in-reliability/ 

Q&A Section

Do you have a question for the experts at RCP?  Submit your question using this form. If your question is selected for a future newsletter, you will be eligible for a gift of your choice from RCP’s online Store.

Upcoming Deadlines:

  • The deadline to submit written comments in response to PHMSA’s forthcoming NPRM on Pipeline Safety: Safety of Gas Distribution Pipeline and Other Pipeline Safety Initiatives will be 60 days from the date of publication in the Federal Register.  Comments may be filed at https://www.regulations.gov/ Docket No. PHMSA-2021-0046.
  • And as a reminder, the “Stay of Enforcement” does not mean regulators don’t expect work toward getting compliance activities in place can be ignored.

If we can help, contact Jessica Foley.

Do you have questions? RCP’s SMEs have the answers. Information will be posted here for questions we often get from clients or discussions we have with regulators regarding interpretations and pending regulatory deadlines.

Q:  To clarify, has there been a final approved and implemented requirement for Management of Change processes for DISTRIBUTION companies? 

A: No, this was published in the Notice of Proposed Rulemaking, but has not yet been discussed within the Gas Pipeline Advisory Committees (GPAC). That must occur prior to publication of any final rule.

Ask the Experts

Do you have a question for the experts at RCP?  Submit your question using this form. If your question is selected for a future newsletter, you will be eligible for a gift of your choice from RCP’s online Store.

Upcoming Deadlines:

  • The deadline to submit written comments in response to PHMSA’s forthcoming NPRM on Pipeline Safety: Safety of Gas Distribution Pipeline and Other Pipeline Safety Initiatives will be 60 days from the date of publication in the Federal Register.  Comments may be filed at https://www.regulations.gov/ Docket No. PHMSA-2021-0046.
  • And as a reminder, the “Stay of Enforcement” does not mean regulators don’t expect work toward getting compliance activities in place can be ignored.

If we can help, contact Jessica Foley.

Ongoing Resources

These articles are maintained and updated as new information becomes available.

Regulatory Watch: Key Dates & Deadlines

REGULATORY SNAPSHOT Last updated November 3, 2026
38Tracked regulations
8Proposed / DFR
18Final rules

Track PHMSA rulemaking, regulatory stages, and important compliance deadlines in RCP's Regulatory Watch.

View Full Regulatory Watch →
Last Updated: October 2026

Conference News

Jan252027

Pipeline Pigging and Integrity Management Conference

▦ January 25, 2027 – January 28, 2027⌖ George R. Brown Convention Center, Houston, TX

The 39th International Pipeline Pigging & Integrity Management Conference (PPIM) will take place at the George R. Brown Convention Center in Houston. The event brings together pipeline operators, engineers, and industry professionals to explore advancements in pipeline inspection, integrity management, risk assessment, and emerging technologies.…

Exhibiting · Booth 524
RCP Team Attending
Heather RoarkHeather Roark
Jessica FoleyJessica Foley
Event Details

Last Updated: November 2026

PSI Training Schedule

Date Training Course Price Registration
Nov 17 – Nov 19, 2026 DOT Pipeline Compliance Workshop $2,150 SOLD OUT
Feb 16 – Feb 18, 2027 Pipeline Safety Audit Training $2,150 Register →
Feb 23 – Feb 25, 2027 Advanced Pipeline Risk Assessment Workshop $2,150 Register →
Mar 23 – Mar 25, 2027 DOT Pipeline Compliance Workshop $2,150 Register →

WEBINAR RECORDING!
Unpacking the Key Updates in API RP 1170 & 1171, 2nd Edition

RCP and the Pipeline Safety Institute offered a free webinar exploring the 2nd Editions of API RP 1170, Design and Operation of Solution-mined Salt Caverns Used for Natural Gas Storage and API RP 1171, Functional Integrity of Natural Gas Storage in Depleted Hydrocarbon Reservoirs and Aquifer Reservoirs. Thank you to everyone who attended and participated in this informative webinar. The session recording is posted to our YouTube channel. Please watch, like, and subscribe to our channel!

WEBINAR RECORDING
Pipeline Safety: Unpacking the Class Location Change Requirements

Thank you to everyone who attended and participated in this informative webinar. The session recording is posted to our YouTube channel. Please watch, like, and subscribe to our channel!

New Workshop Alert!

Prepare Your Team for Pipeline Safety Audits with Confidence!

Our 3-day Pipeline Safety Audit Workshop is tailored for professionals responsible for the safe operation of hazardous liquid and natural gas pipelines. Designed for groups of 10-15 participants, this interactive training…

On-Site Training Request

We have conducted on-site training for oil and gas companies for over 25 years and can provide customized workshops for companies with groups of five or more.

We would welcome the opportunity to discuss our services with you.

Sincerely,

W. R. (Bill) Byrd, PE
President
RCP Inc.