In This Issue

PHMSA Final Rule Correction on EFVs

[DOCKET NO. PHMSA-2011-0009; AMDT. NO 192-121]

In the Final Rule published on October 14, 2016, there was a typo in the modified code language for §192.383(b). The Final Rule stated “An EFV installation must comply with the performance standard in §192.381. After April 17, 2016, each operator must install an EFV on any new or replaced service line serving the following types of services before the line is activated:” (See related article in the DOT Pipeline News October Edition.)

On Friday, October 21, 2016, PHMSA issued a correction that the date should read: “After April 14, 2017, each operator…”