• Skip to primary navigation
  • Skip to main content
  • Skip to footer
  • Call Us(713) 655-8080
  • Get in Touchmessage us
  • Client Accesssign-in

RCP Inc.

  • Home
  • Who We Are
    • About Us
    • Careers
  • What We Do
    • Compliance Programs
      • Operations & Maintenance
      • Control Room Management
      • Facility Response Plans and Integrated Contingency Plans
      • Operator Qualifications
      • Integrity Management Plans
      • Public Awareness
      • Damage Prevention Program
      • Underwater Inspection Procedures
      • PSM/Risk Management Plan
      • Spill Prevention Countermeasures & Control
    • Consulting Services
      • Jurisdictional Determination
      • Acquisition Due Diligence
      • Expert Witness
      • Pipeline Safety Management System
      • Audits
      • Agency Response Support
      • Training
    • Engineering Services
      • MAOP Reconfirmation
      • Pressure Test Services
      • Leak Detection Capabilities Evaluation
      • Emergency Flow Restriction Device Analysis
      • Relief Valve Capacity Evaluation
      • Uprate Studies
      • Conversion of Service Plans
      • Defect Analysis and Repair Plan
      • Root Cause Failure Analysis
      • Engineering Specifications
    • Integrity Management
      • Risk Management
      • ILI Program Management
      • ILI Data Analysis
      • IM Auditing & Compliance Verification
      • IMP Program Development & Maintenance
      • Program Development & Maintenance
      • HCA Analysis
      • Air Dispersion Modeling
      • Class Location
      • Spill Modeling
      • GIS and Mapping Services
      • Threat Analysis
      • Underground Gas Storage
      • Ongoing Integrity Management Support Services
  • Newsletter
    • Current Newsletter
    • Search Newsletter
    • Subscribe
  • Tools
    • Pressure Test Certification
    • MAOP Reconfirmation
    • Pipeline Incident Data
    • Asset Management Tracking System
  • TaskOp
    • Asset Management Tracking System
    • Modules
    • Test Drive
    • Newsletter
  • Pressure Testing
    • TestOp – Transmission Pipelines
      • Overview – Pressure Test Validation
      • Feature List
      • TestOp – FAQ
    • TestApp – Distribution Pipelines
    • Training
      • Pressure Test Training Course
      • TestOp – User Training
    • Testimonials
      • TestOp Testimonials
  • Methane
    • MethOp
    • Request Demo
  • Training
    • DOT Pipeline Compliance Workshop
    • Mega Rule #1: Gas Transmission Regulation Deep Dive Virtual Workshop
    • Unpacking the New Gas Gathering Rule
    • Pressure Testing
    • On-Site Customized Training
    • Calendar of Events
  • Contact Us
Search Open Menu

In This Issue

  1. Outer Continental Shelf-Incident Reporting Requirements
  2. MMS / USCG Incident Reporting Requirements Public Meeting
  3. O&M Manual Up-To-Date?
  4. Technical Pipeline Safety Standards Advisory Committee Meeting
  5. Hazmat Security Regulations / RCP Audit Protocol
  6. Need A HAZMAT Security Plan?
  7. GLO assuming more oil spill responsibility in Texas
  8. RCP’s Fantastic 1-Page Version of New SPCC Regulation
  9. Gas Distribution Fees in Texas
  10. Workshop on Effective Public Awareness Programs for Pipeline Operators
  11. Integrity Management Plan Up-to-Date?
  12. Liquid Advisory Committee Meeting (docket number RSPA-98-4470)
  13. INGAA OQ Update Meeting
  14. Interested in Web-Based Compliance Management Systems?
  15. Texas Final Rule: Natural Gas Pipelines Public Education and Liaison
  16. Texas Final Rule: Hazardous Liquid Pipelines Public Education and Liaison
  17. Texas Proposed Rule: Hazardous Liquid Pipelines Within 1,000 Feet of a Public School
  18. Texas Proposed Rule on Pipelines Crossing 3 or More Counties
  19. Gas Pipeline HCA – Identified Site Guidance
  20. Muscular Dystrophy Lockup / Personal note from the editor

Texas Proposed Rule on Pipelines Crossing 3 or More Counties

The Railroad Commission of Texas has withdrawn from consideration the proposed new 8.120 concerning notifications for construction of new pipelines that cross 3 or more counties (see our April 2003 newsletter).

« Previous Article
Full Issue
August 2003 Issue
Next Article »

Footer

Top

Contact

RCP Inc.
801 Louisiana Street, Suite 200
Houston, TX 77002

(713) 655-8080

info@rcp.com

Recent Newsletters

  • March
  • February
  • January

Subscribe to our DOT Pipeline Compliance Newsletter

  • Home
  • Who We Are
    • About Us
    • Careers
  • What We Do
    • Compliance Programs
      • Operations & Maintenance
      • Control Room Management
      • Facility Response Plans and Integrated Contingency Plans
      • Operator Qualifications
      • Integrity Management Plans
      • Public Awareness
      • Damage Prevention Program
      • Underwater Inspection Procedures
      • PSM/Risk Management Plan
      • Spill Prevention Countermeasures & Control
    • Consulting Services
      • Jurisdictional Determination
      • Acquisition Due Diligence
      • Expert Witness
      • Pipeline Safety Management System
      • Audits
      • Agency Response Support
      • Training
    • Engineering Services
      • MAOP Reconfirmation
      • Pressure Test Services
      • Leak Detection Capabilities Evaluation
      • Emergency Flow Restriction Device Analysis
      • Relief Valve Capacity Evaluation
      • Uprate Studies
      • Conversion of Service Plans
      • Defect Analysis and Repair Plan
      • Root Cause Failure Analysis
      • Engineering Specifications
    • Integrity Management
      • Risk Management
      • ILI Program Management
      • ILI Data Analysis
      • IM Auditing & Compliance Verification
      • IMP Program Development & Maintenance
      • Program Development & Maintenance
      • HCA Analysis
      • Air Dispersion Modeling
      • Class Location
      • Spill Modeling
      • GIS and Mapping Services
      • Threat Analysis
      • Underground Gas Storage
      • Ongoing Integrity Management Support Services
  • Newsletter
    • Current Newsletter
    • Search Newsletter
    • Subscribe
  • Tools
    • Pressure Test Certification
    • MAOP Reconfirmation
    • Pipeline Incident Data
    • Asset Management Tracking System
  • TaskOp
    • Asset Management Tracking System
    • Modules
    • Test Drive
    • Newsletter
  • Pressure Testing
    • TestOp – Transmission Pipelines
      • Overview – Pressure Test Validation
      • Feature List
      • TestOp – FAQ
    • TestApp – Distribution Pipelines
    • Training
      • Pressure Test Training Course
      • TestOp – User Training
    • Testimonials
      • TestOp Testimonials
  • Methane
    • MethOp
    • Request Demo
  • Training
    • DOT Pipeline Compliance Workshop
    • Mega Rule #1: Gas Transmission Regulation Deep Dive Virtual Workshop
    • Unpacking the New Gas Gathering Rule
    • Pressure Testing
    • On-Site Customized Training
    • Calendar of Events
  • Contact Us