Now
that Hurricane season is almost over, this is a reminder to those that have UIP
and IIRM plans that you may want to review them soon.
RCP’s latest Inspection Interval Risk Model (IIRM) has been improved to include
additional inspection trigger results for hazardous liquid pipelines that cross
navigable waterways within Inlets of the Gulf of Mexico. We’ve also created an
optional module that will incorporate risk-based evaluation for deeper water
pipelines in addition to the shallow water pipelines already included in the
IIRM. Several improvements have been incorporated in the Underwater Inspection
Procedure based upon suggestions from PHMSA, other affected operators, and
survey vendors.
For more information on RCP’s Underwater Inspection Program or Interval Risk
Model, contact Jessica Foley.
In This Issue
- PHMSA Advisory Bulletin (ADB-2014-05) Guidance for Strengthening Pipeline Safety through Rigorous Program Evaluation & Meaningful Metrics
- PHMSA Revised O&M Enforcement Guidance
- Audit Assistance
- PHMSA Study of Impact of One-Call Exemptions
- Damage Prevention Plans
- API RP1173 Draft Pipeline Safety Management System
- Illinois Pipeline Regulation Update
- Bored Reading the Federal Register? Try Texas.
- TRRC Chapter 8 Pipeline Safety Adopts Farm Tap Regulations
- PHMSA NPMS Public Meeting
- Pipeline Safety Trust Meeting
- Underwater Inspection Procedures & Inspection Interval Risk Model Updates
- Pipeline Pressure Testing Workshop: January 13-14, 2015
- Pressure Test Certification
- Pipeline Training Reference Museum