PHMSA Issues Revised Inspection Protocols

PHMSA has published revised inspection protocols (updated March 7, 2008) on their website. The list of recently updated inspection protocols include:

  • PHMSA Form-1 (Standard Inspection Report of a Gas Transmission Pipeline)
  • PHMSA Form-2 (Standard Inspection Report of Gas Distribution Operator)
  • PHMSA Form-3 (Standard Inspection of a Liquid Pipeline Carrier)
  • PHMSA Form-4 (Standard Inspection Report of an LNG Facility)
  • PHMSA Form-5 (Evaluation Report of Gas Pipeline & Compressor Station Construction)
  • PHMSA Form-7 (Evaluation Report of Liquid Pipeline Construction)
  • PHMSA Form-10 (Breakout Tank Inspection Form)
  • PHMSA Form-11 (Pipeline Failure Investigation Report)
  • PHMSA Form-12 (Gas Storage Field Review)
  • PHMSA Form-13 (2008 Drug and Alcohol Program Check)
  • PHMSA Form-14 (Operator Qualification Inspection Form)
  • PHMSA Form-15 (Operator Qualification Field Inspection Form)
  • PHMSA Form-19 (Hazardous Liquid IMP Field Verification Inspection)

The inspection protocols can be downloaded at the following website: http://ops.dot.gov/library/forms/forms.htm#Form1