Uncategorized

Pre-Filing Procedures for Review of LNG Terminals and Other Natural Gas Facilities

[Docket No. RM05-31-000; Order No. 665] The Federal Energy Regulatory Commission (Commission) is amending its regulations in accordance with section 311(d) of the Energy Policy Act of 2005 (EPAct 2005) to establish mandatory procedures requiring prospective applicants to begin the Commission’s pre-filing review process at least six months prior to filing an application for authorization…

MMS to Hold Structural Assessment Process Dissemination Meeting

The Minerals Management Service (MMS) Gulf of Mexico OCS region will hold a half-day Structural Assessment Process Dissemination Meeting on the proposed American Petroleum Institute (API) Structural Integrity Management Recommended Practice in Houston on November 15, 2005. The Meeting will take place at The Texas A & M University System Health Science Center, IBT Facilities…

RCP Services Spotlight – RCP Auditing, Due Diligence and Expert Witness Services

RCP’s approach to audits and assessments is typically either consultative or enforcement oriented depending upon the client’s needs. The consultative approach is typically viewed by clients as a cooperative effort that assesses regulatory compliance status in concert with operational and maintenance issues. This method provides feedback on existing management practices versus industry standards. The consultative…

Public Meetings on Operator Qualifications

[Docket No. RSPA-04-19857] This notice announces a public meeting on operator qualification programs. PHMSA is preparing a Report to Congress on the status and results of programs to ensure the qualifications of individuals performing safety tasks on pipelines. The American Society of Mechanical Engineers (ASME) has almost completed developing a consensus standard qualifying individuals performing…

DOT Drug and Alcohol Testing

Proposed rule: Procedures for Transportation Workplace Drug and Alcohol Testing Programs [Docket OST-2003-15245] The Department of Transportation is proposing to amend certain provisions of its drug and alcohol testing procedures to change instructions to laboratories, medical review officers, and employers with respect to adulterated, substituted, diluted, and invalid specimen results. These proposed changes are intended…

Marine Maps Available Online

The National Ocean Service has launched an online site publishing interactive Raster Navigational Charts (RNCs) to give mariners more timely and accurate information in the rapidly changing marine environment. Targeted at improving marine safety and reducing the risk of accidents, interactive RNCs make updated charts available to the mariner faster and with greater accuracy than…

SCADA Safety Study

The National Transportation Safety Board has released its conclusions and recommendations from a study designed to examine how pipeline companies use SCADA systems to monitor and record operating data and to evaluate the role of SCADA systems in leak detection. The study was prompted by the number of hazardous liquid accidents in which leaks went…

RCP Services Spotlight – RCP Auditing, Due Diligence and Expert Witness Services

RCP’s approach to audits and assessments is typically either consultative or enforcement oriented depending upon the client’s needs. The consultative approach is typically viewed by clients as a cooperative effort that assesses regulatory compliance status in concert with operational and maintenance issues. This method provides feedback on existing management practices versus industry standards. The consultative…

Texas Damage Prevention Regulations

The Texas Legislature approved three separate bills in the last legislative session that all give the Railroad Commission of Texas new authority to promulgate regulations for damage prevention programs, including enforcement powers. The RRC is moving quickly in this area, and plans to hold one or more meetings early in 2006 to begin the rulemaking…

Integrity Management Services

RCP can assist pipeline operators with ongoing compliance management and engineering associated with your IMP. This includes direct assessment strategies, tool and vendor selection, ILI/ECDA report analysis, corrosion control programs, repair strategies, and IMP/risk model updates. For more information on how RCP can support your ongoing IMP needs, Click Here.

OPS Issues FAQs for Gas IMP

FAQ-207: Pro-rating ASME B31.8S intervals (11/10/2005)Question: If a pipeline operating below 30% SMYS was pressure-tested at 1.5 times MAOP, can the reassessment interval in ASME B31.8S Table 3 be prorated?Answer: If a hydrostatic pressure test was performed per Subpart J requirements, then the operator may use a seven-year reassessment interval. Extended intervals may be achieved…