Have
you registered and confirmed your reservations for these upcoming conferences?
RCP and RCP Integrity Services will be attending. We hope to see you there!
AGA Operations Conference 2014
May 20 -23, 2014
Omni William Penn, Pittsburgh, PA
The annual AGA Operations Conference is the natural gas industry’s premier
gathering of natural gas utility and transmission company operations management
from across North America and the world for the sharing of technical knowledge,
ideas and practices to promote the safe, reliable, and cost-effective delivery
of natural gas to the end-user.
RCP’s Executive Consultant, Mr. Larry Decker will be giving a presentation on
producing and documenting a quality pipeline pressure test report,
“Utilization of an Advanced In-Situ Pressure Test Validation Mode.”
This presentation describes the use and benefits of an advanced in-situ
pressure test validation model that has been successfully utilized to identify
small leaks during ramp up, spike and hold pressures. Example tests deemed
“successful” using traditional recordkeeping methods that actually
had small leaks will be demonstrated along with traceable, verifiable and
complete report outputs.
Texas Gas Association (TGA) Operations & Management
Conference
June 10 – 13, 2014
San Marcos, Texas
Louisiana Gas Association (LGA) 2014 Pipeline Safety
Conference
July 21 – 25, 2014
New Orleans, LA
Western Regional Gas Conference (WRGC)
August 19 – 20, 2014
Tempe, AZ
In This Issue
- PHMSA Updates Gas Transmission IMP Enforcement Guidance
- PHMSA Revisions to OPID Assignment Request & Operator Registry Notification
- TRRC Chapter 18, Underground Pipeline Damage Prevention
- RCP Receives 3 Patents for MAOP Software
- Safety Management Systems Meeting
- Spring/Summer Conference Schedule
- RCP Pipeline Pressure Testing Workshop August 26 & 27
- ASME Training Week – Denver April 14 – 18
- PHMSA Class Location Methodology Public Workshop – April 16 Hilton Crystal City, Arlington, Virginia
- Class Location Studies
- Send us your tired, your poor, your huddled masses of Pipeline Samples, yearning to breathe free.
- Join RCP’s MS150 Team from Houston to Austin April 12 – 13